Cosmo Tech

Retrofit Planning

Speed-up the implementation of modifications to your production planning while maintaining cost optimization.

Overview

Cosmo Tech Plan enables project and program managers in Manufacturing Industry to optimize planning and take into consideration multiple factors such as resource leveling, crash tests, daily monitoring, contingency plans and sensitivity analysis.

With our solution, they can easily create a dynamic Enterprise Digital Twin of their organization reflecting all interconnected planning data (PPM tools and structured data), business processes and rules (human resources, variable or fixed task duration) into one tool, allowing them to make informed, optimal decisions to optimize planning.

Other Use Case Solutions for Manufacturing

Factory Planning & Scheduling

Optimize your factory’s operational resources, anticipate bottlenecks, and maximize production line efficiency for optimal throughput. Take into account complex production sequences and meet the needs of a dynamic supply chain.
Factory Planning & Scheduling

Asset Obsolescence Management

Build an optimal OPEX/CAPEX asset investment plan to replace and renew obsolete equipment and control risk exposure. Include real-world constraints, understand their impact and bridge the gap between operational and financial views to identify the right strategy.
Asset Obsolescence Management

Production Planning & Control

Design an Enterprise Digital Twin of your supply chain and optimize your production plans to deliver value at every stage of your manufacturing process. In the face of shifting demand variables, achieve a new level of operational efficiency and increase profitability.
Production Planning & Control

Case Studies

Speed Up Modification Implementation Processes

How a manufacturer managed and adjusted numerous projects in a highly constrained environment to implement costs savings plans.

Discover the case study

Optimize Operational Asset Investments

How an international car manufacturer built an optimal OPEX/CAPEX asset investment plan to replace and renew obsolete equipment and control risk exposure.

Discover the case study

Achieve Production Planning Excellence

How a car manufacturer extended their car production with the same capacities, considering a volatile demand, a complex production process, and production flow bottlenecks.

Discover the case study

Optimize Your Manufacturing Planning and Scheduling

How a car manufacturer took into account complex production sequences and met the needs of their dynamic supply chain.

Discover the case study